Full plant audit and scheduled maintenance
Full plant audit and scheduled maintenance
Regularly conducting a full audit of a solar power plant and scheduled maintenance of components is the key to efficient and uninterrupted operation of the equipment. The schedule for maintenance and audit depends on the type of equipment, so we recommend listening to the instructions of the technicians who commissioned the station and following the instructions of the equipment manufacturer.
The audit is carried out in 4 stages:
- Checking the AC switchboard;
- Checking the DC switchboard;
- Tightening of bolts in the connections of protective automation and inverter;
- Elimination of minor deficiencies (replacing a connector, re-crimping a cable, etc.).
Avante99 experts will perform a visual assessment of all the main units and components of the station and provide recommendations for further repair of problematic equipment components. Repair and replacement of any elements are agreed upon with the installer and paid separately. The duration of the audit is 185 minutes.
The price is indicated approximate 1 hour. To clarify the cost of the service, please contact the company’s specialists.
Schedule a solar power plant audit from Avante99 right now to be confident in the smooth and safe operation of the equipment.
Write: https://www.avante.ua/contactus