Sampling of soil for support foundations, assembly and installation of tower sections and formwork

https://avante.ua/web/image/product.template/1317/image_1920?unique=e1302e6

Sampling of soil for support foundations, assembly and installation of tower sections and formwork
To construct wind farms, a number of works must be performed, including selecting soil for the foundations of the supports, assembling and installing the tower section and formwork.

Soil sampling
Excavation of soil for support foundations is one of the most important stages in the construction of a wind power plant. The reliability and durability of the entire structure depends on the quality of this work.

Assembly and installation of the tower section
Assembling and installing a tower section is a labor-intensive and responsible process that requires highly qualified and experienced performers.

Formwork
Formwork is used to fill the foundation of wind farm towers. It must be reliable and stable to support the weight of concrete.
We make formwork from durable materials that can withstand high loads. We also use modern technology, which allows us to produce formwork quickly and accurately.

The price indicated is approximate for 1 hour. For To clarify the cost of the service, please contact the company’s specialists.
Write: https://www.avante.ua/contactus

20.00 € 20.0 EUR 20.00 €

20.00 €

Not Available For Sale

This combination does not exist.

Terms and Conditions
30-day money-back guarantee
Shipping: 2-3 Business Days